Objectives and Requirements:
Drawing upon understandings of the essential nature of Ground, Wall, and Roof, the objective is to create an environmental which enhances the activities of your chosen user group. An important goal for this project is to nurture an awareness of how space, form, articulation and composition of architectural elements may work to enhance the experience of the place for the users.
An essential component of the project is an open shelter (including a roof) to give the users a place to rest, eat, drink, and socialize. It may also function as a place for some of the group to practice their activity when it is raining (except for boating.) When the activity group is not using the shelter, it should be open to the general public for picnicking, relaxing, etc. Some functions of the program may be integrated within the shelter while some may be detached (see Program Elements below)
For the activities of Sword and Fan Dancing and Tai-Chi, a hard-surfaced area should be provided away from the street to perform their exercise.3 A soft surface (grass or other material) may be needed for the practice of Yoga. The shelter for boating may be built on the land, over the water or both.
We are summing a membership of 16 users for the purpose of the project.
Program, Elements
- a covered , open-air activity/ gathering area – size based on the activity of the club.
- a simple kitchenette for making tea, snacks and possibly needles . This should include a place for washing dishes etc.
- restroom with 1 toilet and 1 sink for women and men
- shower and small dressing room with a sink. One each for women and men.
- 16 half or full height lockers. (may be stack 2 high)
- storage as required for the chosen activity.
- housekeeping/ caretaker’s area
program items such as the kitchenette, showers, storage, and housekeeping should be sealed off or locked when not being used by the activity group. The total area under roof should not exceed 100 square meters and may be much smaller.
Assignment:
Building upon the activity & site investigation/analysis, collage/object, conceptual diagrams and sketches which should be complete at this point – work out the initial sketch design. Sketch plan, section and elevations along with a study model (all at 1:50 scale) should be finished by 1:00 PM November 16, 07 The drawings and model should be considered parts of the design process – not merely as items to be produced for a deadline. Certain areas of the model, plan, section and elevations – possibly together with perspectives or isometrics/axonometrics – should be worked on alternately as your concept evolves and your ideas tested. This is not to be a formal presentation, but rather your design in process.